Ingeteam will optimize the maximum performance of several renewable energy facilities in  Central America and the Caribbean
30/06/2020

Ingeteam will optimize the maximum performance of several renewable energy facilities in Central America and the Caribbean

Ingeteam has signed an agreement to market the services of its application with the energy unit of the Multi-Investment Corporation (CMI) located in Central America and the Caribbean. It is a web application that provides Business Intelligence tools with the aim of improving the efficiency of the m...
Read More
Ingeteam, capable of providing over 6 million people with solar energy
20/06/2020

Ingeteam, capable of providing over 6 million people with solar energy

The technology manufactured by the Ingeteam Group allows for the supply of the equivalent to the consumption of over 6 million people, population greater than countries like Norway, Costa Rica or Denmark, thanks to its commitment to solar photovoltaic energy and the continuous development of technol...
Read More
The Ingeteam Group leads the wind sector with its technologies
15/06/2020

The Ingeteam Group leads the wind sector with its technologies

The technological development of the Ingeteam Group in the wind energy sector allows for the supply equivalent to the consumption of millions of households, a new record which has been achieved due to its main role in the supply of wind energy converters and wind generators and the operation and mai...
Read More
Ingeteam the first central inverter manufacturer to be certified to NTS UE 2016-631 (the new European network code)
09/06/2020

Ingeteam the first central inverter manufacturer to be certified to NTS UE 2016-631 (the new European network code)

Ingeteam has become the first central inverter manufacturer to be certified under the Technical Supervision Regulation of conformity (NTS) with Regulation EU 2016-631, specifically for its central inverters in the Ingecon® Sun Power range and its EMS Plant Controller system. With this certificate, I...
Read More
Ingeteam reaches 50GW installed wind capacity milestone
02/06/2020

Ingeteam reaches 50GW installed wind capacity milestone

Ingeteam has commissioned 50 GW of electrical wind power conversion equipment to date, thanks to consistently strong sales of wind power converters and wind control cabinets. Ingeteam entered the wind industry in 1995 working on the development of variable-speed machines. They were the first manu...
Read More
Ingeteam updates its INGEPAC™ RIO with new functions
27/05/2020

Ingeteam updates its INGEPAC™ RIO with new functions

The new INGEPAC™ RIO provides 12 digital inputs and 4 digital outputs, fully programmable, which allow the transfer of signals based on GOOSE messages. FEATURES Provides additional inputs and outputs to existing IED “Mirror" mode to transfer signals between 2 IED located in the same substat...
Read More
Page 29 of 85First   Previous   24  25  26  27  28  [29]  30  31  32  33  Next   Last