22/06/2021
The INGESYS™ IT SCADA system has different software modules specifically designed to meet the needs of O&M personnel in energy and industrial facilities. Among these software modules, we can highlight the remote monitoring and notification modules as the most widely accepted by maintenance perso...
Read More
21/06/2021
Ingeteam has supplied 21 GW of solar inverter power worldwide and maintains more than 8 GW. Its technology is present in the main photovoltaic installations on the planet. Solar is the fastest growing renewable energy in the world. The solar inverters manufactured by Ingeteam can supply ...
Read More
21/06/2021
October will witness the official launch of the new INGEDRIVE™ LV800 range, a further development of the long-established INGEDRIVE™ LV400. The new range of low-voltage, water-cooled frequency converters allows a power density increase of up to 35% compared to the previous range, thus improving the ...
Read More
15/06/2021
Ingeteam has a total of 52 GW of wind converter capacity worldwide and maintains more than 17 GW. Indar, Ingeteam Group has manufactured more than 1300 wind generators so far this year. In 2020, various equipment for energy storage in wind power plants have been provided The equipment pr...
Read More
14/06/2021
Ingeteam will supply the electric traction systems for 12 locomotives and 8 EMUs. The traction equipment, designed and manufactured by Ingeteam, will be installed on trains operating in Poland. Ingeteam has obtained a new order for the supply of traction converters for 12 locomotives and 8 ...
Read More
10/06/2021
Ingeteam finalized last February the commissioning of the 230 kV substation that evacuates the energy generated by the Aventura II wind farm, which generates 105 MW of power. The wind complex belongs to EDP Renováveis and is located in the state of Rio Grande do Norte, in Brazil. The solution suppl...
Read More