Ingeteam Service enters the Belgium market and experiences a 50% growth in Europe
10/12/2015

Ingeteam Service enters the Belgium market and experiences a 50% growth in Europe

Ingeteam's market entry into Belgium marks yet another step forward in its strategy to gain a firm foothold in northern Europe. The company has been awarded the Operation & Maintenance services for the Berloz wind farm, located in eastern Belgium. With this new contract in Belgium, Ingeteam Ser...
Read More
Ingeteam certifies voltage sensors with PLC couplers for their supply to Iberdrola's STAR project
09/12/2015

Ingeteam certifies voltage sensors with PLC couplers for their supply to Iberdrola's STAR project

Ingeteam has gained certification for its voltage sensors with PLC (Power Line Carrier) couplers, model PGR24/10K, within the framework of Iberdrola's STAR (network telecontrol and automation system) project. These sensors combine an EN 61869-3:2011-compliant Class 1 medium voltage stage up to 20k...
Read More
DNV GL awards component certificate to Ingeteam for its frequency converter for  on- and offshore wind turbines
02/12/2015

DNV GL awards component certificate to Ingeteam for its frequency converter for on- and offshore wind turbines

DNV GL, the world’s largest resource of independent energy experts and certification body, awarded component certification to Spanish technology company Ingeteam for its new frequency converter at the EWEA Wind Conference 2015. The DFM 3000 Ingecon® Wind converter offers operational flexib...
Read More
New Substation Automation Contracts
01/12/2015

New Substation Automation Contracts

Recently Ingeteam, more specifically its Power Grid Automation (PGA) unit, was awarded the control and protection system corresponding to the Everley 40MW FV plant, which is due to start functioning in summer 2016. This project joins the company Primrose PV's Canworthy Water FV plant, which is loca...
Read More
 Substation commissioning in Brazil
26/11/2015

Substation commissioning in Brazil

Ingeteam has commissioned IEC 61850-compliant control and protection equipment for two substations, SE Serrita and SE Santa Cruz, for the company Neoenergía CELPE. These two installations are the first of a supply of 15 substations. Besides the control and protection equipment, Inget...
Read More
New INGEDRIVE MV500 with maximum power density
24/11/2015

New INGEDRIVE MV500 with maximum power density

Ingeteam launches the new INGEDRIVE MV500, after an extensive redesign phase at its high power electronics laboratory in Zamudio (northern Spain). Responding to the demands of our clients, who seek to increase the efficiency of their processes and reduce the physical space occupied by frequency co...
Read More
Page 95 of 114First   Previous   90  91  92  93  94  [95]  96  97  98  99  Next   Last