Press room

Ingeteam completes construction of the ArcelorMittal galvanized line in Brasil
23/01/2011

Ingeteam completes construction of the ArcelorMittal galvanized line in Brasil

Ingeteam’s Industry Division has completed the construction of the continuous galvanizing line for ArcelorMittal in the Vega do Sul factory in southern Brazil (state of Santa Catarina). Over the course of two years, a team of more than 100 professional has worked on the design, manufacturing, ...
Read More
We have commissiones a wind power simulator
23/12/2010

We have commissiones a wind power simulator

The budget of nearly 500,000 euros includes the supply, delivery and installation of an IngeDrive LV 400 frequency converter, IngeSYS IT control and monitoring software, and a multiplier for a 2 MW doubly-fed wind turbine. On the test bench, where the simulator will be located, different tests for w...
Read More
23/11/2010

Indar manufactures hydraulic equipment for a facility in Taiwan

Indar Máquinas Hidráulicas, which has received the order this year, is completing the manufacture of eleven submerged pieces of equipment for a Taipei Water Department facility located in Taiwan. This equipment will allow drinking water to be supplied to the people of Taipei. The order consists of ...
Read More
Page 88 of 88First   Previous   79  80  81  82  83  84  85  86  87  [88]  Next   Last