• More than 550 MW in rectifiers for electrolyzers

    More than 550 MW in rectifiers for electrolyzers

INGECON H2 FSK C6000

This full skid type power station is supplied equipped with everything necessary: ​​one or two INGECON H2 C-lyzer rectifiers, the MV/LV transformer, the MV cells, the auxiliary services panel and the auxiliary services transformer.

Optimized logistics

Being a full skid solution, this power station is a plug & play product, ready to install, easily transportable to any place in the world by land and/or sea. All internal connections are made at the factory, making it a turnkey medium voltage solution.

Datasheets

H2 PowerStation Datasheet

  • 14/01/2025

    Solar Energy Expo

    Poland's Largest Renewable Energy Industry Trade Fair Solar Energy Expo is a unique opportunity for professionals seeking cutting-edge solutions ...
  • 06/02/2025

    Renew WI Energy Summit

    RENEW Wisconsin’s Renewable Energy Summit returns to the Monona Terrace in Madison, Wisconsin on February 6, 2025. Join us as we gather with cle...
  • 06/02/2025

    Flotauto

    An annual trade show dedicated to corporate and public authorities vehicle professionals. A one-day networking tool with booths, conferences, vehicle...

Do you need more info?

I agree to receive commercial communications from Ingeteam
I have read and I agree to Ingeteam´s privacy terms.
* You have to accept the Ingeteam´s privacy terms.

Mettre en contact :

Jean-Christophe VIDAL

Tél : + 33(0)6 44 25 30 65

Fax : + 33 (0)5 61 25 00 11

Jean-christophe.vidal@ingeteam.com